Industrial PV Plant Recovery

Root-cause analysis and fault mitigation restoring a 1.5 MW industrial solar array to full output

LocationCali, Colombia
Date2021
Category1.5 MW
Industrial rooftop / ground-mount PV installation.
Industrial rooftop / ground-mount PV installation.
1.5 MWsolar array
RCAroot cause analysis
NEPLANsimulation
Project context

Recovery engagement for a 1.5 MW industrial photovoltaic plant in Cali, Colombia, that was suffering critical operational issues. Root-cause analysis supported by NEPLAN simulation identified the faults, and the mitigation measures restored full generation capacity.

Scope of work
Systems & technologies
Root Cause AnalysisNEPLAN SimulationFault MitigationIndustrial PV1.5 MW
Engineering contribution
Successfully resolved critical operational issues in a 1.5 MW solar array, restoring full generation capacity.

More cases

All 14 cases